Project Parameters
The Task: To demolish a pair of obsolete buildings, relocating all piping and electrical lines that are connected to, and/or supported by the buildings.
The Client: A Chemical and Pharmaceuticals Manufacturer
Time and Location: 2004, Missouri
The Budget: US$750K
Our Involvement
PAC's role: Total design.
We designed the new layout of the piping and its new structural supports using a 3D model. New cable trays were routed in much the same manner.
We delivered drawing packages, including piping isometrics, structural fabrication details, layouts, and electrical diagrams.
Conclusion
The project was completed on time, within the final budget constraints.