Projects
 


See some of the actual projects that PAC has been involved in.

   
Achievements
 


Sample Past Projects

  • Thermal Oxidizers Project
    - PAC's Involvement: I&E Design, 3D Model, Presentation support
    - Project Budget: $27 million
  • Waste Water VOC Stripper
    - PAC's Involvement: I&E Design, 3D Model
    - Project Budget: $17 million
  • Steam Stripper
    - PAC's Involvement: I&E Design
    - Project Budget: $14 million
  • Gas Fired Catalyst Activator
    - PAC's Involvement: Total Design, 3D Model, Operator Training
    - Project Budget: $2.4 million
  • Plastic Pellet Drying and Bagging System
    - PAC's Involvement: Piping, I&E, 3D Model
    - Project Budget: $10 million
  • Aluminum Rod Production and Coil Line
    - PAC's Involvement: P&ID Preparation
    - Project Budget: $20 million
  • Continuous Cast Quench System
    - PAC's Involvement: Total Design, 3D Model
    - Project Budget: $1.0 million
  • Dissolved Air Flotation Clarification System
    - PAC's Involvement: Total Design, 3D Model
    - Project Budget: $0.5 million
  • Waste Water Treatment Facility
    - PAC's Involvement: I&E Design
    - Project Budget: $8 million
  • Food Additive Plant
    - PAC's Involvement: Piping Fabrication Isometrics
    - Project Budget: $100 million
  • Plastic Pellet Cleaning System
    - PAC's Involvement: Total Design, 3D Model
    - Project Budget: $0.5 million
  • Pharmaceutical Centrifuge
    - PAC's Involvement: Total Design, 3D Model
    - Project Budget: $5 million
  • Bio-Diesel Modular Plant
    - PAC's Involvement: Modularization, Total Design, 3D Model
    - Project Budget: $15 million
  • Ammonia Refrigeration System
    - PAC's Involvement: Engineering Support
    - Project Budget: $0.5 million
  • Pharmaceutical Packaging Expansion
    - PAC's Involvement: Conceptual Design, 3D Model
    - Project Budget: $5 million
  • Acid Plant Heat Recovery System (HRS)
    - PAC's Involvement: Piping Design, 3D Model
    - Project Budget: $30+ million
  • Ethanol Plant Piping Systems
    - PAC's Involvement: Piping Isometrics
    - Project Budget: $10 million
   
 
   
 
Untitled Document

© 2007 Process Automation Concepts, Ltd. All rights reserved.
No portion of this page may be copied or modified without the express permission of PAC Ltd.